Progressive Pigging of 16” x 89km Timi Gas Pipeline
Royal Poly Products was selected for the progressive pigging campaign of the 16” x 89 km wet gas pipeline as part of the Timi Field Development, supporting Shell and its partners.
Emergency Foam Pig Deployment – Scarborough Wet Buckle Recovery
Following a wet buckle incident during offshore pipelay operations on the Scarborough Project, a section of the subsea gas export pipeline was flooded with raw seawater
Bespoke Foam Pigs for Large-Bore Pipelines with Over 100 Bends
Royal Poly Products was engaged to design and manufacture a bespoke foam pig capable of navigating over 100 consecutive 90-degree, small radius bends in an onshore pipeline system.